摘要
根据可研设计阶段特点,采用统计设计法,分析部分已投运的高水头抽水蓄能电站情况,结合制造厂商推荐的相关参数,初步确定乌龙山抽水蓄能电站水泵水轮机比转速水平。
Based upon characteristics of feasibility study design stage, and adopting statistical design method to analyze some high head pump storage power station in service, it initially determines specific speed of the pump turbine for Wulongshan pump storage power station.
出处
《西北水电》
2006年第1期43-45,57,共4页
Northwest Hydropower
关键词
抽水蓄能电站
水泵水轮机
比转速
pump storage power station
pump turbine
specific speed