摘要 在深基坑降排水设计方案中,为获得较好的降水效果,在常见基坑降水方案的基础上,结合实际工程,对大口径井点降水和封闭降水的应用效果进行分析,对比两种方法的应用效果,以及相关施工要求。对比后发现,封闭降水法结合支护体系可以较好地为沟槽开挖施工提供“无水”环境,获得较好的降水效果,且周围地表没有发生沉降变形的情况,基坑主体施工质量和现状建筑物质量均得到满足。 In the deep foundation pit drainage design scheme,in order to obtain better dewatering effect,based on the common foundation pit dewatering scheme,combined with the actual project,the application effect of large-diameter well point dewatering and closed dewatering is analyzed,and the application effect of the two methods is compared,as well as the related construction requirements.After comparison,it is found that the closed dewatering method combined with the supporting system can provide a“waterless”environment for the trench excavation construction,and obtain a good dewatering effect.Besides,the surrounding surface does not settle and deform,and the construction quality of the main foundation pit and the quality of the current building are satisfied.
作者 张洋 魏杰 张思琦 ZHANG Yang;WEI Jie;ZHANG Si-qi(China Construction Communications Engineering Group Corp.Ltd.,Beijing 100166,China;CSCEC Railway Engineering Co.Ltd.,Beijing 100166,China)
出处 《工程建设与设计》 2024年第13期47-49,共3页 Construction & Design for Engineering
关键词 深基坑 土建工程 降排水 对比 止水帷幕 deep foundation pit civil engineering drainage contrast waterstop curtain
  • 相关文献

参考文献3

二级参考文献13

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部