摘要 文章主要结合济南市济阳区滨河市政设施建设项目,立足施工重难点,分析了满堂支架施工和现浇施工的要点。分析表明,在桥梁人行道现浇拱圈工程施工中,搭设满堂支架可为钢筋、混凝土、模板等各道工序提供安全、稳定的操作平台,进而保障桥梁人行道现浇拱圈工程施工任务顺利完成。 Based on the construction project of Binhe municipal facilities in Jiyang District of Jinan City,this paper analyzes the key points of full support construction and cast-in-place construction based on the key and difficult points of construction.The analysis shows that in the construction of bridge sidewalk cast-in-place arch ring engineering,the setting of the full support can provide a safe and stable operation platform for various procedures such as steel bars,concrete and formwork,so as to ensure the successful completion of the construction task of bridge sidewalk cast-in-place arch ring engineering.
作者 马天慧 MA Tianhui(Investment and Industrial Development Division of CCCC Construction Group,Beijing 100010,China)
出处 《工程技术研究》 2024年第5期16-18,共3页 Engineering and Technological Research
关键词 桥梁人行道 现浇拱圈工程 满堂支架 现浇施工 bridge sidewalk cast-in-place arch ring engineering full support cast-in-place construction
  • 相关文献

参考文献5

二级参考文献20

共引文献16

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部