平面分段流水线出运工位改善方案

下载PDF
导出
摘要 该文介绍平面分段流水线出运工位对平面分段建造尺寸的影响,结合某船厂平面分段流水线的案例,提出3个不同方案,包括分段提升梁、分段抬升梁以及临时顶升装置等,3个方案对改善平面分段流水线出运工位能力,提高平面分段上线率有较大的帮助,可为后续其他船厂平面分段流水线设计和改造提供参考。 This paper introduces the influence of the delivery station of the plane segmented assembly line on the plane segmented construction size,and puts forward three different schemes,including the segmented lifting beam,the segmented lifting beam and the temporary lifting device,combining with the case of the plane segmented assembly line in a shipyard.The three schemes are of great help to improve the delivery capacity of the plane segmented assembly line and increase the rate of plane segmented assembly line,which can thus provide reference for the design and transformation of plane sectional assembly line in other shipyards.
出处 《科技创新与应用》 2024年第11期160-163,共4页 Technology Innovation and Application
关键词 平面分段流水线 分段抬升 出运工位改善 分段提升梁 分段抬升梁 plane segmented assembly line segmented lifting delivery station improvement segmented lifting beam segmented lifting beam
  • 相关文献

参考文献4

二级参考文献4

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部