期刊文献+

一起35 kV跨线故障主变保护先于线路保护动作分析

Analysis of main transformer protection acting before the line protection for a 35 kV cross-line fault
下载PDF
导出
摘要 阐述110 kV巴克什营变电站1号主变后备保护先于巴克线313线路保护动作的故障概况,分析1号主变动作情况和巴克线313保护动作情况。将巴涝线314保护启动信息加入到整个故障分析中。由于线路保护对时不准,利用三相电流突变和零序电压的故障特征,将故障录波波形和线路保护内部波形统一,将整个故障情况进行还原,得出1号主变和巴克线313保护均正确动作。 Describes the fault overview of the backup protection of the No.1 main transformer in the 110 kV Bakeshenying station prior to the protection action of 313 line of Barker line,analyzes the action of No.1 main transformer and the protection action of 313 line of Barker line.The starting information of the 314 protection of Balao line is added to the overall fault analysis.Since the line protection is not accurate,the fault recording waveform and the internal waveform of the line protection are unified by using the fault characteristics of three-phase current mutation and zero sequence voltage,the whole fault situation is restored.It is concluded that the 313 protection of No.1 main transformer and Barker line are correct.
作者 王旭亮 白旭 侯丽珺 董兴华 WANG Xuliang;BAI Xu;HOU Lijun;DONG Xinghua(Chengde Power Supply Company,State Grid Jibei Electric Power Co.,Ltd.,Chengde 067000,China)
出处 《黑龙江电力》 CAS 2024年第1期81-87,94,共8页 Heilongjiang Electric Power
关键词 跨线故障 主变保护 线路保护 保护动作 cross circuit fault main transformer protection power line protection protection action
  • 相关文献

参考文献13

二级参考文献74

共引文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部