摘要 以某山区风电场为研究对象,基于最短路径Dijkstra算法,以风电场场内新建道路路径和电缆长度最短为优化目标,建立了满足山区风电场的道路纵坡坡度、最小转弯半径、敏感区、边界、桩距等约束条件的选线算法,该算法的特点一是采用规则三角网格和对角距启发式函数来搜寻六个方向,满足最小转弯半径的要求,大大提高了算法便捷性。二是算法分两步进行,第一步针对主线道路服务,仅输入需要优化的道路的起止点,即可获得两点的最短路径;第二步针对支线道路服务,以第一步得到的主线道路为已有道路,只需要输入支线道路抹点(机位点坐标)坐标,即可自动寻索到该点距离主线道路的最短路径。研究结果可为实际的风电场建设前期工作提供重要的过程指导。 Taking a mountainous wind farm as the research object,based on the shortest path Dijkstra algorithm,with the shortest new road path and cable length in the wind farm field as the optimization goal,a route selection algorithm is established to meet the constraints of road longitudinal slope gradient,minimum turning radius,sensitive area,boundary and pile distance.The algorithm has the following characteristics.First,the regular triangular grid and the diagonal distance heuristic function are used to search six directions to meet the requirements of the minimum turning radius,which greatly improves the convenience of the algorithm.Secondly,the algorithm is divided into two steps.The first step is for the main road service,and the shortest path of the two points can be obtained when the start and end points of the road to be optimized are input.The second step is for the feeder road service.With the main road from the first step as the existing road,the shortest path of the distance from the main road to the end point can be obtained automatically when the coordinates of the feeder road end point(coordinates of tower locations)are input.The research results of this paper can provide important process guidance for the preliminary work of actual wind farm construction.
作者 马俊祥 赵振宙 玛尔瓦提·黑扎提 郑康乐 张爽 吴昊 张克凡 MA Junxiang;ZHAO Zhenzhou;HEIZHATI Maerwati;ZHENG Kange;ZHANG Shuang;WU Hao;ZHANG Kefan(School of Renewable Energy,Hohai University,Nanjing 211100,China;Henan Clean Energy Branch of Huaneng International Power Co.,Ltd.,Zhengzhou 450000,China;China Power Construction Chongqing Survey and Design Institute Co.Ltd.,Chongqing 401120,China;Huaneng Linhe thermal power plant,Inner Mongolia Bayannaoer 015000,China)
出处 《内蒙古工业大学学报(自然科学版)》 2024年第1期48-55,共8页 Journal of Inner Mongolia University of Technology:Natural Science Edition
基金 国家自然科学基金项目(52376179,51876054)。
关键词 山区风电场 道路及集电线路 优化设计 mountain wind farm road and power collection line optimization design
  • 相关文献

参考文献5

二级参考文献11

  • 1杨珺,张闯,孙秋野,王刚.风电场选址综述[J].太阳能学报,2012,33(S1):136-144. 被引量:28
  • 2龚晓南.地基处理手册[M].北京:中国建筑工业出版社,1996. 被引量:2
  • 3JTJ017-96.公路软土地基路堤设计与施工技术规范[S].[S].,.. 被引量:338
  • 4JTGB01-2003.公路工程技术标准[S].[S].,.. 被引量:937
  • 5JTGD30-2004.公路路基设计规范[s].[S].,.. 被引量:902
  • 6刘玉卓.公路工程软基处理[M].北京:人民交通出版社,2003.. 被引量:46
  • 7JTG D20-2006,公路路线设计规范[S]. 被引量:628
  • 8JTG F10-2006,公路路基施工技术规范[S]. 被引量:365
  • 9交通部第二勘察设计院,公路设计手册--路基[M].第二版2006. 被引量:1
  • 10张婷.风电场建设投资构成与电价分析[J]中国科技财富,2012(16):66-67. 被引量:1

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部