水电永临结合在穿插施工中的应用与研究

APPLICATION AND RESEARCH OF COMBINATION OF PERMANENT AND TEMPORARY WATER AND ELECTRICITY WORKS IN PENETRATION CONSTRUCTION
下载PDF
导出
摘要 建筑施工中水电永临结合技术,是通过提前穿插正式消防工程,提前穿插照明系统的布管、穿线和灯具安装,在主体施工阶段完成正式消防立管的安装以及正式照明的管线点位预埋工作,从而达到利用正式消防立管用作临时消防及施工临时用水的目的以及利用正式照明系统达到施工照明的目的。在极大地提升现场安全文明施工形象的同时,达到了绿色节能环保的要求。因此水电永临结合施工技术具有良好的发展前景及推广应用前景。 A combination of permanent and temporary water and electricity works in engineering construction is to install permanent fire risers and bury permanent lighting pipelines through penetration of permanent fire risers and permanent lighting pipes,wires and fixtures in advance in the stage of construction of main works,in order to achieve the purposes of using permanent fire risers for temporary fire water and construction water supply and permanent lighting systems for lighting in construction.This not only greatly improves the site image of safe and civilized construction,but also meets the requirements for green construction,energy saving and environmental protection.Therefore,a combination of permanent and temporary water and electricity works has promising prospects of development,promotion and application.
作者 赵汝强 ZHAO Ru-qiang(ECEG NO.4 Construction Engineering Co.,Ltd.,100024,Beijing,China)
出处 《建筑技术》 2023年第22期2755-2757,共3页 Architecture Technology
关键词 永临结合 穿插施工 节能环保 绿色施工 combination of permanent and temporary penetration construction energy saving and environmental protection green construction
  • 相关文献

参考文献8

二级参考文献28

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部