永临结合在房建工程施工中的应用探讨 被引量:11

Permanent Works and Temporary Facilities Combined with Application of Construction in Construction Engineering
下载PDF
导出
摘要 目前我国房屋建筑工程常规施工建设程序一般为先临建再永久、先主体再室外。其建设过程整体工期过长,临建措施费用投资浪费。对此,结合现场工程实例,就永临结合施工技术方案优化,分析探讨了其缩短建设工期,节省建设投资成本,改善施工作业环境及形象的应用优势,同时为同行提供相应参考与借鉴。 At present,during the construction period of general housing construction projects in China,the conventional construction procedures usually start by constructing temporary facilities,then constructing permanent projects,constructing the main works first,and then constructing outdoor projects.The whole construction period is too long,and temporary measures cost waste of investment.In view of this,combined with on-site engineering practice,this paper analyzes and optimizes the construction technology plan with the combination of permanent and temporary construction,analyzes and explores its advantages in shortening the construction period,saving construction investment cost,improving construction operation environment and image,and providing reference for
作者 张涛 Zhang Tao
出处 《建筑技术开发》 2018年第20期22-24,共3页 Building Technology Development
关键词 永临结合 技术方案 作业环境 permanent combination technical scheme working environment
  • 相关文献

参考文献8

二级参考文献26

共引文献20

同被引文献45

引证文献11

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部