期刊文献+

218线那拉提至巴仑台公路桥梁空心薄壁墩施工与质量控制 被引量:1

Construction and quality management of hollow thin wall piers for highway bridges from Nalati to Baluntai on Line 218
下载PDF
导出
摘要 随着公路建设与发展的推进,空心薄壁墩滑模组合模板施工技术被广泛应用于实际工程。这种技术有助于解决就地模板施工中的一系列问题,如高空作业、施工速度慢、施工质量差以及耗费人力物力等。文章以国道218线那拉提至巴仑台公路NBTZ-3标段为例,详细介绍了空心薄壁墩的施工技术,并提出施工质量控制管理措施,通过该施工技术的使用,落实各项技术环节与加强质量的管控,极大地提升了项目施工质量与效率,旨在为类似工程提供借鉴和参考。 With the advancement of highway construction and development,the construction technology of hollow thin-walled pier sliding formwork combination formwork is widely used in practical engineering.This technology helps to solve a series of problems in on-site formwork construction,such as high-altitude operations,slow construction speed,poor construction quality,and the consumption of manpower and resources.The article takes the NBTZ-3 section of National Highway 218 from Nalati to Baluntai as an example to introduce in detail the construction technology of hollow thin-walled piers and propose construction quality control management measures.Through the use of this construction technology,various technical links are implemented and quality control is strengthened,greatly improving the construction quality and efficiency of the project,aiming to provide reference for similar projects.
作者 牙地卡尔·吾买尔 Yadikaer Wumaier(Xinjiang Communications Investment Construction Management Co.,Ltd.,Urumqi 830000,China)
出处 《江苏科技信息》 2023年第24期56-59,共4页 Jiangsu Science and Technology Information
关键词 桥梁 空心薄壁墩 施工技术 质量控制 bridge hollow thin-walled pier construction technique quality control
  • 相关文献

参考文献3

二级参考文献11

共引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部