成都东变电所为变配电合建所,承担成都东枢纽及多条高铁线路的牵引供电和电力供电任务。为提升成都东变电所供电灵活性和可靠性,对成都东变电所进行专项排查,针对存在的问题制定系统性整治方案并组织实施,取得一定成效。
Chengdu East substation,a joint substation incorporated with substation and power distribution substation,undertakes the tasks of traction power supply and electric power supply for Chengdu East hub and several high-speed railways.In order to improve the flexibility and reliability of power supply of Chengdu East substation,a special investigation is organized for Chengdu East substation,systematically improving schemes are established and implemented for the existed problems,with certain achievements obtained accordingly.
出处
《电气化铁道》
2023年第S01期83-87,共5页
Electric Railway
关键词
变配电合建所
运行方式
灵活性
设备整治
a joint substation incorporated with substation and distribution substation
operation mode
flexibility
equipment improvement