桥梁墩柱分节段预制拼装技术研究 被引量:2

Study on Segmental Prefabrication and Assembly Technology of Bridge Pier Column
下载PDF
导出
摘要 针对高大型构件的运输及吊装成为装配式的一大技术瓶颈问题,分析现在预制桥墩装配技术在城市桥梁的应用,高大型墩柱是目前需解决的装配式桥梁施工的难题。通过梳理当前国内外较为常见的节段拼装连接方式,采用试验分析的手段对比研究不同连接方式的预制拼装立柱的力学性能,推荐无黏结预应力钢筋和灌浆套筒组合连接作为分节段预制拼装立柱的拼装方式。 The transportation and hoisting of tall and large components has become a major technical bottleneck of assembly.By analyzing the application of precast pier assembly technology in urban bridges,it is found that high and large pier column is a difficult problem that needs to be solved in advance in bridge assembly construction.In this paper,by combing the common segmental assembling connection methods at home and abroad at present,the mechanical properties,cost and difficulty of construction of precast assembled columns with different connection methods are comparatively studied by means of experimental analysis,and the combination connection of unbonded prestressed steel bar and grouting sleeve is recommended for segmental precast assembled columns.
作者 方伟太 FANG Wei-tai(China Railway Construction Bridge Engineering Bureau Group 2st Engineering Co.Ltd.,Shenzhen 518083,China)
出处 《工程建设与设计》 2023年第13期192-194,共3页 Construction & Design for Engineering
关键词 桥梁墩柱 节段 预制拼装 灌浆套筒 预应力 bridge pier columm segment prefabrication and assembly grouting sleeve prestress
  • 相关文献

参考文献1

二级参考文献18

  • 1DBJ/CT082-2010润泰预制装配整体式混凝土房屋结构体系技术规程[s].上海:上海市建筑建材业市场管理总站,2010. 被引量:1
  • 2Splice-sleeve north America [ EB/OL i. http://www. splicesleeve, corn/. ACI 550. 被引量:1
  • 31R-OI Emulating east-in-place detailing in precast concrete structures [ S ]. American Concrete Institute, Farmington Hills, Michigan, 2001. 被引量:1
  • 4Erico lenton Q interlok [ EB/OL ]: http://www, erico, corn/ products/INTERLOK, asp. 被引量:1
  • 5Einea, Yamane T, Tadros. Grout-filled pipe splices tot precast concrete construction [ J]. PCI Journal, 1995,40( l ) :82-93. 被引量:1
  • 6Ong tlern Yee. Experimental study of grout filled splice sleeve integrated with shear key for precast concrete connection [ D]. University Technology MALAYSIA, 2010. 被引量:1
  • 7ASTM A1034-10a Standard test method tar testing mechanical splices for steel reinforcing bars [ S ]. ASTM. West Conshohocken, PA ,2010. 被引量:1
  • 8ACI 318-08 Building code requirements for structural concrete and commentary [ S]. American Concrete Institute, Farmington Hills, Michigan, 2005. 被引量:1
  • 9中国建筑科学研究院.JG1107-2010钢筋机械连接技术规程[S].北京:中国建筑工业出版社,2010. 被引量:1
  • 10Belleri, Riva P. Seismic behavior of precast column-to- foundation grouted sleeve connections [ C]//The 14th World Conference on Earthquake Engineering. 2008. 被引量:1

共引文献100

同被引文献15

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部