摘要
H工厂污水处理包括居住区、化工工业园区等,其中工业废水占比超过半数以上,出水符合国家行业排放标准,尾水符合要求后排入就近河道。工程设计主要是将H工厂的生活污水与工业园区的工业废水分质处理和收集。改造方案主要是将处理线改造和拆分,确保处理后的尾水符合国家对污染物排放的行业标准。H工厂分质题标工程改造后,生活污水与工业废水运行费用较原有有所增加,双线运行稳定,符合国家对行业的排放标准要求。
The wastewater treatment of Plant H includes residential area,chemical industrial park,etc.,in which industrial wastewater accounts for more than half,and the effluent meets the national industry discharge standards,and the tailwater is discharged into the nearest river after meeting the requirements.The engineering design is mainly to treat and collect the domestic wastewater of H factory and the industrial wastewater of the industrial park in separate quality.After the renovation,the operation cost of domestic wastewater and industrial wastewater has increased compared with the original one,and the operation of the dual lines is stable and meets the requirements of the national discharge standards for the industry.
作者
朱博
高健
Zhu Bo;Gao Jian(Shaanxi Yanchang China Coal Yulin Energy Chemical Co.,Ltd.,Yulin Shaanxi 718500)
出处
《现代工业经济和信息化》
2023年第4期279-281,共3页
Modern Industrial Economy and Informationization
关键词
工业废水
生活污水
化工园区
分质提标
工程设计
industrial wastewater
domestic wastewater
chemical park
separation and upgrading
engineering design