期刊文献+

基于无应力状态法的钢管混凝土拱桥施工线形和扣索索力计算 被引量:1

Calculation of Construction Alignment and Buckling Cable Force of Concrete-filled Steel Tube Arch Bridge Based on Non-stress State Method
下载PDF
导出
摘要 为保证主拱圈在规定时间内合龙,采用无应力状态法对拱圈施工过程中的线形进行计算,提出一种基于影响矩阵的索力计算和优化方法,实现扣索的一次张拉即可满足施工和设计要求,并以一座钢管混凝土拱桥为例,应用该方法对主拱圈的安装进行线形和索力控制。合龙后主拱圈的成拱线形和索力实测值与理论值吻合,验证了该方法能够精确控制成拱线形。 In order to ensure the closure of the main arch ring within the specified time,the line shape during the construction process of the arch ring is calculated using the stress-free state method,and a cable force calculation and optimization method based on the influence matrix is proposed to meet construction and design requirements by one-time tensioning of the buckle cable.Taking a CFST arch bridge as an example,this method is used to control the alignment and cable force of the installation of the main arch ring.The measured values meet with the theoretical values of arched line shape of the main arch ring and cable force after closure,which verifies that this method can control arched line shape accurately.
作者 杜黎明 DU Liming(China Railway 12th Bureau Group Fourth Engineering Co.,Ltd.,Xi′an 710000)
出处 《公路交通技术》 2023年第2期106-113,共8页 Technology of Highway and Transport
基金 国家重点研发计划项目(2020YFF0217801)。
关键词 无应力状态法 影响矩阵 索力计算 钢管混凝土拱桥 stress-free state method influence matrix cable force calculation CFST arch bridge
  • 相关文献

参考文献15

二级参考文献68

共引文献144

同被引文献17

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部