摘要
既有线改建项目中施工过渡方案是站场改建施工顺利进行和完成的关键。根据内江北站的具体情况,对站场改建及过渡施工方案进行了研究,并对方案进行了优化。研究结果表明该方案能为内江北站工程提质达速提供可靠的依据。
In the existing line reconstruction project,the construction transition scheme is the key to the smooth progress and completion of station reconstruction.According to the specific situation of Neijiang North Station,this paper studies the station reconstruction and transition construction scheme,and optimizes the scheme.The research results show that the scheme can provide a reliable basis for the speed and quality improvement project of Neijiang North Station.
作者
赵亚辰
ZHAO Yachen(China Railway Eryuan Engineering Group Co.,Ltd,Chengdu,Sichuan 610031)
出处
《现代工程科技》
2022年第1期27-30,共4页
Modern Engineering Technology
关键词
施工过渡
站场改建
内江北站
优化
construction transition
station reconstruction
Neijiang North Station
optimization