土压平衡盾构下穿人防工程施工控制技术 被引量:3

CONSTRUCTION CONTROL TECHNOLOGY OF EARTH PRESSURE BALANCE SHIELD TUNNELLING CIVIL AIR DEFENSE ENGINEERING
下载PDF
导出
摘要 城市地铁建设中不可避免地出现土压平衡盾构下穿人防工程,以南昌地铁盾构下穿京密引水渠为工程背景,给出了盾构关键施工参数的计算方法,讨论了掘进管理姿态、出土、注浆等关键要素以及它们之间的内在联系。提出了施工中出现喷涌、开仓换刀、沉降量过大问题的关键控制技术,保障了施工的安全高效。 The case of earth pressure balance shield tunnelling civil air defense engineering inevitably occurs in the construction of urban subways.Based on the engineering of Nanchang subway shield tunnelling under the Jing-Mi diversion canal,obtain the calculation method of the key construction parameters of the shield tunnel,and discuss key factors such as tunneling management posture,excavations and grouting,as well as the internal relations between them.The key control technology for the problems of gushing,opening the warehouse to change tools,and excessive settlement in construction is proposed,ensuring the safety and efficiency of constructions.
作者 张明伟 ZHANG Ming-wei(The Third Engineering Co.,Ltd.,of China Railway 18 th bureau group,072750,Zhuozhou,Hebei,China)
出处 《建筑技术》 2022年第11期1561-1564,共4页 Architecture Technology
关键词 土压平衡 人防工程 施工控制 earth pressure balance civil air defense engineering construction control
  • 相关文献

参考文献8

二级参考文献38

共引文献43

同被引文献18

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部