195m钢管拱桥缆索吊系统缆扣局部分离吊装施工技术 被引量:2

Construction Technology on Partial Separation and Hoisting of Cable Buckles for Cable Crane System of 195 m Concrete-Filled Steel Tube Arch Bridge
下载PDF
导出
摘要 结合恩施公路主跨195 m钢管混凝土拱桥项目,分析了缆索吊装施工的重难点,根据山区陡峭的地形条件,针对缆索吊机的索跨布置及结构形式,提出缆扣索共塔、缆扣塔完全分离、缆扣局部分离等形式;针对缆扣局部分离,提出了利用桥台及引桥自重来锚固拱脚节段的设计思路;阐述了拱肋节段的吊装施工。实践表明:利用桥台及引桥自重来平衡拱脚节段扣索张拉力的这种缆扣局部分离技术,使拱肋拱脚节段在吊装过程更加安全、定位更加快捷,缩短了施工工期,降低了施工成本,可为类似工程施工提供参考。 Combined with the project of Enshi highway main span 195 m concrete-filled steel tube arch bridge,the key and difficult points of cable hoisting construction are analyzed.According to the steep terrain conditions in mountainous areas and the cable span layout and structural form of cable crane,the forms of cable buckle common tower,complete separation of cable buckle tower,partial separation of cable buckles and so on are proposed;aiming at the partial separation of cable buckles,the design idea of using the self weight of abutment and approach bridge to anchor the arch foot segment is put forward;this paper expounds the hoisting construction of arch rib segments.The practice shows that this local separation technology of cable buckles,which uses the self weight of the abutment and the approach bridge to balance the cable tension of the arch foot segment,makes the arch rib and arch foot segments safer and faster positioning in the hoisting process,shortens the construction period,reduces the construction cost,and provides a reference for the construction of similar projects.
作者 郑伯强 ZHENG Boqiang(China Railway 17^(th)Bureau Group 2^(nd)Engineering Co.Ltd.,Xi’an Shaanxi 710024,China)
出处 《铁道建筑技术》 2022年第11期116-119,150,共5页 Railway Construction Technology
基金 中铁十七局集团有限公司科技研发项目(2019-11)。
关键词 钢管拱桥 缆索吊 缆扣局部分离 吊装施工 steel tube arch bridge cable crane partial separation of cable buckle hoisting construction