摘要
基坑工程是火车站建设实施必不可少的工程环节。为确保合肥西站东广场深基坑工程得以顺利实施,结合该工程实际情况,分别从基坑开挖原则、基坑开挖方法、基坑开挖顺序和基坑开挖注意事项这四个方面详细介绍了该基坑工程的具体实施方案。该方案为合肥西站东广场深基坑工程提供了科学合理的可靠保障,也为相似工程提供借鉴。
The foundation pit project is an indispensable engineering link in the construction and implementation of the railway station.In order to ensure the smooth implementation of the deep foundation pit project in the East Square of Hefei West Railway Station,the specific implementation scheme of the foundation pit project was introduced in detail from the four aspects of the foundation pit excavation principle,the foundation pit excavation method,the foundation pit excavation sequence and the matters needing attention in the foundation pit excavation.This scheme provided a scientific,reasonable and reliable guarantee for the deep foundation pit project of the East Square of Hefei West Railway Station,and also provided a reference for similar projects.
作者
许敏
Xu Min(Hefei Rail Transit Group Co.,Ltd.,Hefei 230000,China)
出处
《山西建筑》
2022年第23期84-86,95,共4页
Shanxi Architecture
关键词
深基坑
开挖方案
合肥西站
台阶法开挖
deep foundation pit
excavation plan
Hefei West Station
excavation by step method