摘要
山洞油库罐室建设施工技术比较复杂,涉及爆破、通风排烟、施工排水、施工监控量测、不良地质处理等,具有一定的施工难度,同时还有一定的危险性。论文研究了山洞油库罐室施工前的准备工作,分析了编制施工方案时的通用方法;对于山洞油库罐室施工时通用的爆破技术、通风排烟和施工监控量测分别进行了剖析,从技术要点的角度分析了这些技术的可行性。
The construction technology of tank room of cave oil depot is relatively complex, involving blasting, ventilation and smoke exhaust, construction drainage, construction monitoring measurement, bad geological treatment, etc., which has certain construction difficulty and also has certain risk. This paper studies the preparation work before construction of tank chamber of cave oil depot, and analyzes the general method of construction plan and the common blasting technology, ventilation and smoke exhaust and construction monitoring measurement in the construction of tank chamber of cave oil depot, and analyzes the feasibility of these technologies from the point of view of technical points.
作者
田伟
李旭
孙赞
TIAN Wei;LI Xu;SUN Zan(Unit 95338,Guangzhou 510000,China;Air Force Logistics Department Engineering Management Agent Construction Office,Guangzhou 510000,China)
出处
《工程建设与设计》
2022年第14期128-130,共3页
Construction & Design for Engineering
关键词
山洞
油库罐室
爆破施工技术
地质预测
tank room of oil depot in cave
blasting construction technology
geological prediction