期刊文献+

某金矿选矿厂球磨机衬板及分级设备优化改造

Optimization and renovation of ball mill linings and grading equipment in the concentrator of a gold mine
下载PDF
导出
摘要 针对某金矿球磨机衬板使用寿命不统一、分级设备分级效果差异大等问题,对球磨机衬板及分级设备进行优化改造。将球磨机端盖衬板由合金钢衬板改为橡胶衬板,并对衬板参数、结构进行优化,使衬板总质量减少约2/3,并缩小了衬板使用寿命差异。在磨矿系统的分级设备水力旋流器上加装压力表,使水力旋流器的浓度差异控制在3%以内,细度差异控制在5%以内。同时,对比了水力旋流器损坏部件修复与购买新部件的成本,据相关数据统计,每年可节约部件投入成本40余万元。 In the concentrator of a gold mine,the life of ball mill linings differs and there is a huge gap between the grading performances of grading equipment.In light of these facts,the ball mill linings and grading equipment are optimized and renovated.The ball mill linings shift from alloy steel linings to rubber linings.The linings parameter and structure are optimized,reducing the lining weight by 2/3 and narrowing the gap of lining life.The installation of pressure meter to hydraulic cyclone,the grading equipment in milling system,controls the concentration gap of hydraulic cyclone under 3%and the fineness gap under 5%.At the same time,the costs are compared to decide whether to repair damaged parts or purchase new parts.According to related statistics,the investment in parts can be saved by 0.4 million yuan annually.
作者 杨小慧 Yang Xiaohui(Jiaojia Gold Mine,Shandong Gold Mining Industry(Laizhou)Co.,Ltd.)
出处 《黄金》 CAS 2022年第7期50-53,共4页 Gold
关键词 球磨机 分级设备 衬板优化 水力旋流器 修复再利用 ball mill grading equipment lining optimization hydraulic cyclone repair and reuse
  • 相关文献

参考文献10

二级参考文献77

共引文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部