摘要
本文以某湖北220kV变电站为例,分析了该变电站的地质条件情况,结合设计条件及方案提出了四种地基处理方案,并在对比经济技术指标后根据实际情况推荐冲孔灌注桩为本工程的地基处理方案。
Taking a 220kV substation in Hubei Province as an example,this paper analyzes the geological conditions of the substation,proposes four ground treatment schemes based on the designing conditions and schemes,and recommends perforated cast-in-place piles as the foundation treatment of the project after comparing the economic and technical indicators according to the actual situation.