期刊文献+

杭海城际高架车站运架梁施工阶段分析

Beam Transporting and Erecting Construction Stage Analysis of Elevated Station of Hangzhou-Haining Intercity Railway
下载PDF
导出
摘要 杭海城际铁路的桥建合一高架车站需要承担运架梁作业,本文研究了高架车站的施工阶段分析计算方法,通过对高架车站的运架梁作业的各种工况进行施工阶段分析,得到了一些有益结论。最后,对特殊的工程做法以及对施工的要求进行了总结。分析计算结果及工程做法可供类似工程参考。 The elevated station of Hangzhou-Haining intercity railway using bridge-station combined structure,should undertake beam transporting and erecting operation.The calculation methods of construction stage analysis of Elevated Station were investigated,various working conditions of beam transporting and erecting were analyzed,and some beneficial conclusions are gained.At last,the specific project practice and construction reguirement were summarized.The analysis results and project practice can be a good reference for the similar engineerings.
作者 叶志雄 YE Zhixiong(China Railway SIYUAN Survey And Design Group Co.,LTD.,Wuhan 430063)
出处 《铁道勘测与设计》 2022年第2期45-48,共4页 Railway Survey and Design
关键词 桥建合一高架车站 运梁车 架桥机 施工阶段分析 Bridge-station combined structure Transporting girder vehicle Erecting bridge machine Construction stage analysis
  • 相关文献

参考文献14

二级参考文献51

共引文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部