期刊文献+

煤巷快速掘进临时支护支架的设计及应用 被引量:1

Design and Application of Temporary Support Bracket for Rapid Coal Tunneling
下载PDF
导出
摘要 为解决当前煤巷掘进时支护时间过长导致实际掘进时间不足,进而影响整体的掘进效率以及生产效率的问题,以某矿1501掘进工作面为例,在对其地质条件和矿压现象规律分析的基础上,完成了临时支护支架的结构和关键参数尺寸的设计。试验表明,新设计的临时支护支架掘进速度提升50%左右,应用效果理想。 In order to solve the current problem that the support time in coal tunneling is too long,which leads to insufficient actual digging time and thus affects the overall digging efficiency and productivity,the design of the structure and key parameters of the temporary support bracket is completed based on the analysis of its geological conditions and the law of mine pressure phenomenon,taking a 1501 digging face as an example.The test shows that the digging speed of the newly designed temporary support bracket is increased by about 50%,and the application effect is ideal.
作者 许文林 Xu Wenlin(Changgou Coal Mine,Jinneng Holding Coal Group,Jinzhong Shanxi 032700)
出处 《机械管理开发》 2022年第3期122-123,126,共3页 Mechanical Management and Development
关键词 快速掘进 临时支护支架 掘进机 推进速度 液压支柱 fast digging temporary support bracket roadheader propulsion speed hydraulic pillar
  • 相关文献

参考文献5

二级参考文献35

共引文献164

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部