分段凿岩阶段空场嗣后充填采矿工艺优化研究 被引量:9

Research on Mining Technology Optimization for Sublevel Drilling and Stage Open-stope Method with Backfill
原文传递
导出
摘要 莱新铁矿应用单侧推进的分段凿岩阶段空场嗣后充填法开采厚大矿体,存在生产能力低、损失率高等问题。结合现场生产现状和矿体开采条件,对目前应用的采矿方法进行优化设计,并在现场进行工业试验。试验结果表明,与原先应用的单侧推进的分段凿岩阶段空场嗣后充填法相比,优化后的采场结构参数与布置方式可以使采场生产能力提高112%,矿石回采率提高3%,出矿成本下降18%(5.71元/t),获得了良好的技术经济指标。 Laixin Iron Mine used the unilateral-propulsion sublevel drilling and stage open-stope method with backfill to mine the thick and large ore body,existing the problems of low production capacity and high loss rate.Aiming at the problems,combined with the current production status and the mining conditions of the ore body,optimal design on the mining method was carried out,and the industrial test was carried out on the site.The test results show that compared with original mining method,the optimized stope structure parameters and arrangement can increase the stope production capacity by 112%and the ore recovery rate by 3%,as well as decrease the ore drawing cost by 18%(5.71 RMB/t),with good technical and economic indicators.
作者 鄂玉强 E Yuqiang(Changsha Institute of Mining Research Co.,Ltd.,Changsha,Hunan 410012,China;State Key Laboratory of Safety Technology of Metal Mines,Changsha,Hunan 410012,China)
出处 《矿业研究与开发》 CAS 北大核心 2022年第3期6-9,共4页 Mining Research and Development
关键词 分段凿岩阶段空场嗣后充填法 采矿方法 优化设计 隔一采一 Sublevel drilling and stage open-stope method with backfill Mining method Optimal design Mining one every one
  • 相关文献

参考文献18

二级参考文献132

共引文献116

同被引文献101

引证文献9

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部