期刊文献+

高层钢框架-混凝土核心筒结构同步等高攀升施工技术 被引量:7

Construction Technology of High-rise Steel Frame-concrete Core Tube with Synchronous Equal Height Climbing
下载PDF
导出
摘要 高层核心筒因无爬架而无法施工,导致外钢框架钢梁连接核心筒时无受力点,也无法施工,影响整个项目的工期。为解决上述问题,研发一种高层钢框架-混凝土核心筒同步等高攀升施工技术,在核心筒周围设置支撑体系,作为核心筒未施工时的钢梁受力点,将外框钢结构独立成全钢结构形式,实现外围钢框架与核心筒同步施工,外围楼板与核心筒墙柱同步浇筑。 The high-rise core tube can not be constructed because there is no climbing frame.As a result,when the steel beam with outer steel frame is connected to the core tube,there is no stress point and can not be constructed,which affects the construction period of the entire project.In order to solve the abovementioned problems,a high-rise steel frame-concrete core tube synchronous contour climbing construction technology is introduced.A support system is set around the core tube as the stress point of the steel beam when the core tube is not constructed,and the outer frame steel structure is independently made into a full-steel structure.The form realizes the simultaneous construction of the outer steel frame and the core tube,and the simultaneous pouring of the outer floor slab and the wall columns of the core tube.
作者 陈钟 胡文学 杨欢 陈建良 刘博 徐宝全 穆霖 CHEN Zhong;HU Wenxue;YANG Huan;CHEN Jianliang;LIU Bo;XU Baoquan;MU Lin(China Construction Fifth Engineering Division Co.,Ltd.,Shenzhen,Guangdong518000,China)
出处 《施工技术(中英文)》 CAS 2022年第4期114-117,127,共5页 Construction Technology
关键词 高层建筑 钢框架-混凝土 核心筒 支撑 施工技术 tall buildings steel frame-concrete core tube supports construction
  • 相关文献

参考文献8

二级参考文献35

共引文献41

同被引文献40

引证文献7

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部