摘要
珠海长隆宿舍一期工程在宿舍楼屋顶设备下做浮筑地台加泡沫混凝土找坡层作为设备基础,同时在居住层的卧室地坪添加隔声垫,形成浮筑楼板。以此为例,介绍了员工宿舍楼隔声减振设计方案及施工方法。实践证明,这两种措施均产生良好的隔声减振效果,且成本低廉、施工速度快,可为同类工程提供借鉴。
In the first phase of Zhuhai Changlong dormitory project,the floating floor and foam concrete slope are used as the equipment foundation under the roof equipment of the dormitory building.At the same time,the sound insulation mat is added to the floor of the bedroom floor to form the floating floor slab.Taking this as an example,the sound insulation and vibration reduction design scheme and construction method of staff dormitory building are introduced.Practice shows that these two measures have good sound insulation and vibration reduction effect,low cost and fast construction speed,which can provide reference for similar projects.
作者
李聪聪
魏小强
郑富家
黄旭
LI Congcong;WEI Xiaoqiang;ZHENG Fujia;HUANG Xu(China Construction Second Engineering Bureau Co.,Ltd.Southern China Branch,Shenzhen,Guangdong 518048,China)
出处
《建筑施工》
2022年第1期92-94,共3页
Building Construction
关键词
隔声减振
浮筑地台
泡沫混凝土找坡层
弹性层设计
浮筑楼板
sound insulation and vibration reduction
floating floor
foam concrete slope
elastic layer design
floating floor slab