摘要
以某火电厂桩基础旋挖灌注桩项目为例,从减小泥浆指标存在的误差、测锤改良成测管、灌注前混凝土用量细化计算及缩短等料时间四个方面介绍粉砂层混凝土灌注桩充盈系数的控制措施。
Taking a pile foundation project of a thermal power plant as an example,this paper introduces the control measures of fi lling coeffi cient of concrete fi lling pile in silty sand layer from four aspects,including reducing the error of mud index,improving the measuring hammer into measuring pipe,refi ning the calculation of concrete dosage before grouting and shortening waiting time for materials.
作者
冀紫豪
高科飞
JI Zihao;GAO Kefei(China Hebei Construction&Geotechnical Investigation Group Ltd.,Shijiazhuang 050000)
出处
《中国建材科技》
CAS
2021年第6期133-134,140,共3页
China Building Materials Science & Technology
关键词
旋挖灌注桩
粉砂层
充盈系数
rotary drilling cast-in-place pile
silt layer
fi lling coeffi cient