期刊文献+

南方CASS7.1与3DMine计算量方法对比——以牛苦头露天矿坑土石方剥离量复核验收测量为例 被引量:1

Comparison between CASS7.1 and 3DMine calculation methods in South China——Taking the recheck and acceptance measurement of earthwork stripping volume in niukutou open pit as an example
下载PDF
导出
摘要 大中型露天有色金属矿山剥离量计算关系到施工单位与建设单位利益的关键工作,因此认识不同软件计算出的剥离量的差异性具有重要的意义。CASS7.1与3DMine软件能高效快捷成图并计算出剥离土石方工程量,解决工程量存在的纠纷与争议,得到各方的认可。以青海鸿鑫矿业有限公司牛苦头矿区露天采场土石方剥离量复核验收测量为例,浅析CASS7.1与3DMine软件在大中型露天矿坑土方量计算中的计算步骤及相关经验。 the calculation of stripping volume of large and medium-sized open-pit non-ferrous metal mines is the key work related to the interests of the construction unit and the construction unit.Therefore,it is of great significance to understand the differences of stripping volume calculated by different software.CASS7.1 and 3DMine software can efficiently and quickly map and calculate the stripped earthwork quantities,solve the disputes and disputes existing in the quantities,and get the approval of all parties.Taking the review and acceptance measurement of earthwork stripping volume in niukutou open pit of Qinghai Hongxin Mining Co.,Ltd.as an example,this paper analyzes the calculation steps and relevant experience of CASS7.1 and 3DMine software in the earthwork calculation of large and medium-sized open pit.
作者 许文洪 李双龙 杨保虾 王新雨 XU Wen-hong;LI Shuang-long;YANG bao-xia;WANG Xin-yu(Qinghai Hongxin Mining Co.,Ltd.,Golmud 816099;Beijing Institute of mineral geology Co.,Ltd.,Beijing 100012)
出处 《世界有色金属》 2021年第16期166-167,共2页 World Nonferrous Metals
  • 相关文献

参考文献5

二级参考文献19

共引文献53

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部