摘要 以某海上风电场典型高桩承台基础的封底混凝土施工为研究背景,利用ANSYS中面-面接触单元,建立钢管桩与封底混凝土间的三维有限元接触模型,研究粘结滑移对封底混凝土应力的影响。计算结果表明:两种模型计算结果差距明显,高桩承台基础不考虑桩与封底混凝土粘结滑移时,封底混凝土拉应力偏小,设计偏危险,不利于结构的安全性;考虑桩与封底混凝土粘结滑移后,桩周拉应力增大尤为明显,故有必要采用更符合实际的接触单元建模方式。 Taking the construction of the bottoming concrete of a typical high-pile cap foundation in an offshore wind farm as background,the surface-surface contacting element in ANSYS is adopted to establish a three-dimensional finite element contact model between the steel piles and the bottoming concrete for studying the impact of bond slip on bottoming concrete stress.The calculation results of the two models are obviously different.When the high-pile cap foundation does not consider the bond slip between the pile and the bottoming concrete,the tensile stress of the bottoming concrete is smaller and the design scheme is dangerous,which is not conducive to the safety of the structure.By comparison,the tensile stress around the piles increase obviously after considering the bond slip,so it is necessary to adopt the contact elements to simulate the bond slip,which makes the model built more in line with the actual situation.
作者 穆君 刘浩兵 李娜 王文华 MU Jun;LIU Haobing;LI Na;WANG Wenhua(PowerChina Zhongnan Engineering Corporation Limited,Changsha 410014,Hubei,China;State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian 116024,Liaoning,China;Institute of Earthquake Engineering,Faculty of Infrastructure Engineering,Dalian University of Technology,Dalian 116024,Liaoning,China)
出处 《水力发电》 CAS 2021年第8期99-104,135,共7页 Water Power
基金 国家自然科学基金资助项目(52001052)。
关键词 海上风机 高桩承台 封底混凝土 桩基础 接触 offshore wind turbine high pile cap bottoming concrete pile foundation contact
  • 相关文献

参考文献12

二级参考文献70

共引文献72

同被引文献23

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部