期刊文献+

水电工程变更审核单价编制中的限价限量方法研究与实践

Research and Practice on the Treatment of Price Limit and Amount Limit in the Engineering Change Audit of Hydropower Projects
下载PDF
导出
摘要 本文以湖北某水电工程大坝面板柔性填料、围堰高喷防渗变更为例,对水电工程变更审核单价编制中超出取费规定或约定的限价、限量处理方法进行介绍,以实践证明类似处理方法可为业主节约投资,并能得到承包人认可,为其他类似工程的变更审核提供参考。 Taking the change of flexible filler of dam face slab and high-pressure jet grouting seepage control of cofferdam of a hydropower project in Hubei province as an example,this paper introduces the price limit and limit treatment method in the unit price compilation of hydropower project change review,and proves that the similar treatment method can be used by the owner.It can save investment and be approved by the contractor,which can provide reference for other similar engineering change audit.
作者 柯云 李会绒 王永刚 KE Yun;LI Huirong;WANG Yonggang(Powerchina Northwest Engineering Corporation Limited,Xi’an 710065,China)
出处 《建筑经济》 北大核心 2021年第6期57-60,共4页 Construction Economy
关键词 水电工程 限价 限量 变更 hydropower projects price limit amount limit change
  • 相关文献

参考文献3

二级参考文献2

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部