摘要
矿井井筒建设和井筒装备安装施工是BIM技术应用的重要方面。BIM对于施工信息的实时性、全面性反馈实现了对工程项目从设计到施工全过程的动态化跟踪管理,使施工具有很大的前瞻性,做到了有备无患。本文首先分析了BIM的技术特点,对其在矿井井筒装备安装施工中的应用进行了探讨。
Mine shaft construction and shaft equipment installation and construction are important aspects of BIM technology application.BIM's real-time and comprehensive feedback of construction information realizes the dynamic tracking management of the whole process from design to construction of the project,which makes the construction very forward-looking and prepared.This article first analyzes the technical characteristics of BIM,and discusses its application in the installation and construction of mine shaft equipment.
作者
王香云
WANG Xiang-yun(Mechanical and Electrical Installation Engineering Department of ChinaCoal First Construction Co.,Ltd.,Handan 056000,China)
出处
《价值工程》
2021年第16期235-236,共2页
Value Engineering
关键词
BIM技术
矿井井筒
安装施工
井筒装备
BIM应用
BIM technology
mine shaft
installation and construction
shaft equipment
BIM application