期刊文献+

广东水利工程竣工验收率低成因及对策探析 被引量:1

Reasons and Measures for Low Acceptance Rate of Water Conservancy Projects in Guangdong Province
下载PDF
导出
摘要 目前广东水利工程竣工项目验收率低,未验收项目也存在诸多问题,只有解决该类问题,才能实现工程效益最大化。对此通过统计广东未及时竣工验收项目各方面情况,分析其存在问题并针对性地提出对策建议,以期为同类项目提高竣工验收率提供参考和借鉴。 Currently,the completion acceptance rate of water conservancy projects in Guangdong province is low,and problems in uncompleted acceptance projects are various.Only by effectively solving these problems,can the project benefit be maximized.Based on the statistics of the untimely completion and acceptance of water conservancy projects in Guangdong province,the main existing problems are analyzed and discussed,and some corresponding solutions are put forward.
作者 徐丹丽 XU Dan-li(Guangdong Hydropower Planning&Design Institute,Guangzhou 510635,China)
出处 《广东水利电力职业技术学院学报》 2021年第2期23-25,共3页 Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词 水利工程 竣工验收 存在问题 对策建议 water conservancy projects completion inspection and acceptance problems effective measures
  • 相关文献

参考文献4

二级参考文献3

共引文献14

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部