摘要
目前广东水利工程竣工项目验收率低,未验收项目也存在诸多问题,只有解决该类问题,才能实现工程效益最大化。对此通过统计广东未及时竣工验收项目各方面情况,分析其存在问题并针对性地提出对策建议,以期为同类项目提高竣工验收率提供参考和借鉴。
Currently,the completion acceptance rate of water conservancy projects in Guangdong province is low,and problems in uncompleted acceptance projects are various.Only by effectively solving these problems,can the project benefit be maximized.Based on the statistics of the untimely completion and acceptance of water conservancy projects in Guangdong province,the main existing problems are analyzed and discussed,and some corresponding solutions are put forward.
作者
徐丹丽
XU Dan-li(Guangdong Hydropower Planning&Design Institute,Guangzhou 510635,China)
出处
《广东水利电力职业技术学院学报》
2021年第2期23-25,共3页
Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词
水利工程
竣工验收
存在问题
对策建议
water conservancy projects
completion inspection and acceptance
problems
effective measures