在迁建新业务大楼正式投入运行前,采用质量审核、试运行、目视检查等方法,分阶段确认新建血站的基础设施、设备、环境、工作流程等是否达到预期要求,探讨新血站系统化确认方法。新建或迁建后的血站在正式启用前应对其所涉及的建筑设施、设备、环境、工作流程等进行全面且系统的确认,以更好地保障血液质量与安全。
Before the new business building was formally put into operation,the quality audit,visual inspection,trial operation and other methods were adopted to confirm whether the infrastructure,equipment,environment and work flow of the new blood station met the expected requirements by stages,and the systematic confirmation method of the new blood station was discussed.In order to better guarantee the quality and safety of blood,a comprehensive and systematic confirmation should be carried out on the construction facilities,equipment,environment and work flow involved in the newly built or relocated blood stations before official operation.
作者
骆展鹏
彭楷
许茜
代华友
杨丹蓉
杨春燕
杨冬燕
黄霞
LUO Zhanpeng;PENG Kai;XU Qian(Chongqing Blood Center, Chongqing, 400000, China)
出处
《中国卫生质量管理》
2021年第5期92-94,共3页
Chinese Health Quality Management
基金
重庆市采供血机构血液质量集中化检测与控制模式研究(编号:2017MSXM129)。
关键词
血站
新建
迁建
系统化
确认
Blood Station
New Construction
Relocation
Systematization
Confirmation