摘要
电网工程档案是真实反映电网建设项目全貌最重要的资料和证据,其管理是否规范,从一定程度可以反映出工程项目的管理是否规范、工作是否高效。超高压公司在分析以往电网工程档案管理问题的基础上,将全过程控制理念运用于昆柳龙直流工程中,按照事前介入、事中控制、事后验收对电网工程档案的全生命周期管理进行管控,以提升档案管理的效益和水平。
The power grid project archives are the most important material and evidence that truly reflect the full extent of power grid construction projects.Whether their management is standardized or not can to some extent reflect the degree of standardization and efficiency of the project management.On the basis of analyzing the problems of archives management of power grid projects in practice,EHV Power Transmission Company of China Southern Power Grid applies the whole process control concept to the Kunliulong DC project,which means controlling the whole life cycle management of power grid project archives in accordance with pre-intervention,in-process control,and post-check before acceptance,in order to improve the efficiency and level of archives management.
作者
陈晖
刘茜
陈慧
罗慧玉
Chen Hui;Liu Qian;Chen Hui;Luo Huiyu
出处
《兰台世界》
2021年第6期48-51,共4页
Lantai World
基金
2019年国家社会科学基金青年项目“面向创新型国家建设的工程档案知识赋能及其实现路径研究”(项目编号:19CTQ037)。
关键词
电网工程
工程档案
全过程控制
档案管理
power grid project
project archives
whole process control
archives management