邱集煤矿1102工作面切顶留巷支护设计及矿压实测 被引量:10

Support design and mine pressure measurement of 1102 working face in Qiuji Coal Mine
下载PDF
导出
摘要 以邱集煤矿1102工作面运输巷坚硬顶板支护问题为背景,建立未切顶巷道顶板的悬臂梁模型和切顶留巷顶板的变形及受力模型;由理论计算得出切顶前巷道顶板伸向采空区的悬臂梁结构的最大悬臂长度为4.68 m,切顶后悬吊单位长度的巷道顶板所需支护阻力为166.74 kN;据此进行巷道支护参数设计,确定恒阻大变形锚索规格为φ17.8 mm×10 300 mm,两列锚索排距分别为1 000 mm和2 000 mm,并对巷道矿压进行监测。监测结果表明:1102运输巷距开切眼75 m至173 m范围内巷道顶底板移近量最大值约36 mm,顶板离层出现在泥岩灰岩的交界处,累计离层量为25 mm,顶板锚索受力最大值为150 kN,变形和受力均处于安全范围内,满足巷道的稳定性要求。 Take the background of hard roof support problem of Qiuji Coal Mine 1102 working face haulageway,the cantilever beam model of uncutting roadway roof and the deformation and stress model of gob-side entry retaining are established. The maximum cantilever length of roadway roof cantilever beam structure is 4.68 m by theoretical calculation;the support resistance of the roadway roof with unit length suspended is 166.74 kN. Based on this, the parameters of roadway are designed, the specification of constant resistance and large deformation anchor cable is determined as φ17.8 mm × 10 300 mm, and the spacing of two columns of anchor cable to be 1 000 mm and 2 000 mm respectively, and the roadway mine pressure is monitored.Monitoring results show that: within the range of 75 m to 173 m from the open-cut hole in 1102 haulageway, the maximum displacement of roadway roof and floor is about 36 mm, the roof abscission layer occurs at the junction of mudstone and limestone,the accumulative amount of abscission layer amount is 25 mm, the maximum stress of roof anchor cable is 150 kN, both deformation and stress are within a safe range, meet the stability requirement of roadway.
作者 云明 郑洪运 李廷春 赵仁乐 武善元 朱庆文 YUN Ming;ZHENG Hongyun;LI Tingchun;ZHAO Renle;WU Shanyuan;ZHU Qingwen(Shandong Qiuji Coal Mine Co.,Ltd.,Dezhou 272116,China;Shandong Provincial Key Laboratory of Civil Engineering Disaster Prevention and Mitigation,Shandong University of Science and Technology,Qingdao 266590,China)
出处 《煤矿安全》 CAS 北大核心 2021年第3期127-132,136,共7页 Safety in Coal Mines
基金 国家自然科学基金资助项目(41772299)。
关键词 切顶卸压 沿空留巷 复合顶板 支护参数 矿压实测 roof cutting and pressure relief gob-side entry retaining composite roof support parameters mine pressure measurement
  • 相关文献

参考文献18

二级参考文献171

共引文献969

同被引文献71

引证文献10

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部