摘要
阐述了店坪矿2031巷工程概况,介绍了综掘机拐弯前期准备工作,详细探究切巷拐弯开口及绞车硐室施工方法,从多个方面对其效益进行分析,为矿井实现安全、高效发展奠定了坚实的基础。
This paper expounds the general situation of the 2031 roadway project in Dianping Mine,introduces the preparatory work for the turning of the fully mechanized excavator,probes into the construction method of the turning opening of the cutting roadway and the winch chamber in detail,analyzes its benefit from many aspects,and lays a solid foundation for the safe and efficient development of the mine.
作者
陈小军
Chen Xiaojun(Huozhou Coal and Power Group Lyuliangshan Coal Power Co.,Ltd.,Lyuliang Shanxi 033102)
出处
《机械管理开发》
2021年第2期171-172,208,共3页
Mechanical Management and Development
关键词
综掘机
拐弯开口
循环进度
施工
fully mechanized excavator
bend opening
cycle progress
construction