摘要
以深圳110 kV龙华中心预制装配式变电站项目为例,针对装配式变电站的工程技术难点,从预制构件生产、装配施工、信息管理等方面提出了相应的技术措施。同时,为更好地促进预制装配式变电站的发展与应用,提出了在构件生产、设计优化、现场作业以及验评标准等方面的推广建议。
Taking Shenzhen 110 kV Longhua center prefabricated substation project as an example,in view of the engineering and technical difficulties of prefabricated substation,the corresponding technical measures are proposed from the aspects of precast component production,fabricated construction and information management.At the same time,in order to promote the development and application of prefabricated substation,some promotion suggestions are put forward in the aspects of component production,design optimization,field operation and evaluation standards.
作者
李政道
谭波
陈哲
熊美琴
LI Zhengdao;TAN Bo;CHEN Zhe;XIONG Meiqin(School of Civil and Transportation Engineering,Shenzhen University,Shenzhen,Guangdong 518060,China;Shenzhen New Energy Power Development and Design Institute Co.,Ltd.,Shenzhen,Guangdong 518052,China)
出处
《建筑施工》
2021年第2期228-231,共4页
Building Construction
基金
科技部重点研发计划子课题(项目编号2018YFB2100901,子课题序号Z5)
国家自然科学基金青年科学基金项目(71801159)
广东省自然科学基金项目(2018A030310534)
教育部人文社科项目(18YJCZH090)
深圳市科技创新委员会基础研究面上项目(JCYJ20190808174409266)。
关键词
装配式
预制构件
变电站
智能化
信息化管理
prefabricated
precast component
substation
intellectualization
information management