摘要
In an integrated refining and petrochemical complex,a centralized utility system(CUS)is introduced to integrate the steam demands of production plants.Besides,two sub-utility systems(SUSs)located inside the alkene and refinery plants,respectively,can satisfy the shaft demands.It is difficult to determine the steam production of the CUS because the steam demands of the alkene and refinery plants also depend on the design and operation of the SUSs.To explore the complicated interaction between the CUS and SUSs,we proposed a mixed-integer nonlinear programming(MINLP)model for the design and optimization of multiple interconnected utility systems to minimize the total annualized cost(TAC).An extended superstructure was suggested to contain multiple inter-plant connected steam pipe alternatives between the CUS and SUSs.A more accurate model of the complex steam turbine was proposed.Then the proposed MINLP framework is applied to a new integrated refining and petrochemical complex.Two scenarios are investigated in the case study to explore the effect of steam main temperatures on system configurations and operating parameters.By optimizing the main temperatures,a TAC of$2.7 million can be saved.Judging from the results of the two scenarios,the feasibility and effectiveness of the proposed framework for the design and optimization of multiple interconnected utility systems have been demonstrated.