摘要
介绍了利用悬挂式贝雷梁桁架代替满堂脚手架进行12m跨度渡槽槽体支撑,解决了复杂地形条件下搭设满堂脚手架费时、费工,施工成本及工期增加等难题,从而快速、安全、高效地完成了渡槽施工任务。
An introduction was made on the application of hanging Berey-beam truss to substitute all-round scaffold for supporting the aqueduct with a span of 12m,which solve the problems of constructing all-round scaffold under complex topographical conditions such as more time,more labor,more construction cost and longer construction period,permit rapid,safe and efficient construction of aqueduct.
作者
蓝天缘
LAN Tian-yuan(Zuojiang Drought Control Project Management Center,Chongzuo 532200,China)
出处
《广西水利水电》
2020年第6期79-82,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
贝雷梁桁架
满堂脚手架
渡槽施工
宁明干渠
Berey-beam truss
all-round scaffold
construction of aqueduct
Ningming main channel