摘要
以综采工作面采煤机电缆自动拖拽装置试验台设计为例,详细介绍了综采工作面采煤机电缆自动拖拽装置试验台总体设计、机械结构设计和电气控制设计等,并对采煤机电缆自动拖拽装置试验台功能及调试验证进行了阐述说明。
Taking the design of the testbed for the automatic cable dragging device of the shearer in the fully mechanized working face as the example, introduced in detail the overall design, mechanical structure design and electrical control design of the testbed for the automatic cable dragging device of the shearer in the fully mechanized working face, and expound the function and debugging verification of the testbed for the automatic cable dragging device of the shearer.
作者
杨立
Yang Li(Beijing Tiandi-marco Electronic-hydraulic Control System Co.,Ltd.,Beijing 100013,China)
出处
《煤矿机械》
北大核心
2020年第11期16-19,共4页
Coal Mine Machinery