3Loyd East, Ron Willett, Jim Surjaatmadja, et al. Application of new fracturing technique improves stimu lation success for openhole horizontal completions[J]. SPE 86480, 2004. 被引量:1
4McDaniel B W, Jim B Surjaatmadja.Hydrajetting applications in horizontal completions to improve hydraulic fracturing stimulations and 2009. improve ROI[J].SPE 125944,. 被引量:1
5Rob Haris, Lyle Laun.lmprovements in multistage fracturing of horizontal wells using a newly Introduced single trip coiled tubing conveyed annular perforating and fracturing tooll-benefits, savings and case histories[J].SPE 127738, 2010. 被引量:1
6Anderson A J, Ashton P J, Lang Jet al.Production Enhancement through Aggressive Flowback Procedures in the Codell Formation[J].SPE 36468, 1996. 被引量:1
7Robert B D, Mukherjee H.Engineering Criteria for Fracture Flowback Procedures[J].SPE 29600.1995. 被引量:1
8Chuck Zeiler, David Alleman.Use of Viscoelastic Surfactant-Based Diverting Agents for Acid Stimulation[J]. SPE 90062.2004. 被引量:1
9Chang F, Acock A, Geoghagan A, et al.Experienee in Acid Diversion in High Permeability Deep Water Formations Using Visco-Elastic-Surfactant[J].SPE 71691.2001. 被引量:1
10Abrams A.Mud design to minimize rock impairment due to particle invasion[J].Petrol Technol, 1977, 29(3):586-593. 被引量:1