Optimization of initial layout of continuous system in Yimin Open-pit Mine
下载PDF
导出
摘要 伊敏露天矿现对剥离工艺进行改造,通过采用连续系统代替部分单斗-卡车系统。针对初步设计与生产实际的采区时空关系的变化,通过对露天矿生产规划、系统搬迁、附属工程等因素进行分析,优化了连续系统初期布置方式,减少项目初期投资,提高了连续系统的生产效率。 Yimin Open-pit Mine reforms the stripping process by using a continuous system to replace part of the single-buckettruck system.Due to the change of the spatial and temporal relationship between the preliminary design and the actual production,this article analyzes the factors such as production planning,system relocation and subsidiary engineering in the open-pit mine,optimizes the initial arrangement of the continuous system,reduces the initial investment of the project,and improves the production efficiency of the continuous system.
作者 刘金强 刘清勋 张波 潘博 LIU Jinqiang;LIU Qingxun;ZHANG Bo;PAN Bo(Yimin Open-pit Mine,Huaneng Yimin Coal and Electricity Co.,Ltd.,Hulunbeiˊer 021134,China)
出处 《露天采矿技术》 CAS 2020年第5期95-97,共3页 Opencast Mining Technology
关键词 露天矿 剥离工艺 连续系统 生产规划 生产效率 open-pit mine stripping process continuous system production planning production efficiency
  • 相关文献

参考文献7

二级参考文献23

  • 1李建祥,唐立新,吴会江,无.露天矿短期生产调度建模研究[J].计算机集成制造系统,2005,11(2):195-199. 被引量:4
  • 2王青,王智静,马沂夫.露天开采整体优化方法[J].金属矿山,1996,25(6):10-13. 被引量:10
  • 3Fytas K. A computerized model of open pit short and long range production scheduling . In: Proceeding of the 19th APCOM Symposium. SME-AIME, 1986. 109 ~ 119 被引量:1
  • 4Robinson R H, Prenn N B. An open pit design model. in: Proceeding of the 10th APCOM. SME-AIME, 1972,155 ~ 163 被引量:1
  • 5Nelson L R, Goldstern M R. Interactive short-range mine planning -a case study , in: Weisis A (Eds.), Computer Methods for the 80's in the Mineral Industry, SME- AIME, 1980,592 ~ 600 被引量:1
  • 6Dagdelen K. Optimum multi period open pit mine production scheduling. Golden: Colorado School of Mines, 1985 被引量:1
  • 7Caceetta L, Hill S P. An application of branch and cut to open pit mine scheduling. Journal of Global optimization, 2003, 27: 349 ~365 被引量:1
  • 8Gershon M. Heuristic approaches for mine planning and production scheduling. International Journal of Mining and Geological Engineering, 1987(5): 1 ~ 13 被引量:1
  • 9Johnson T B. Optimmum open-pit mine production scheduling. Berkeley:University of California, 1968 被引量:1
  • 10现代露天煤矿标通设计体系研究报告,2000. 被引量:2

共引文献33

同被引文献22

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部