期刊文献+

露天矿短期生产调度建模研究 被引量:4

Research on modeling of short-term production scheduling for open pit mine
下载PDF
导出
摘要 针对数学规划模型得到的露天矿短期生产调度在实际生产中的不可行现象,引入开采区域规整性概念用以表示模型结果的现实可行性,并提出基于距离的规整性测度。该规整性测度的形式是非线性的,影响其应用。提出了一种方法将其转化为线性表达式。将该规整性测度作为目标函数添加到一般的露天矿短期生产调度模型中,建立了多目标规划模型,并使用点估计加权和方法求解。计算结果表明,新建立的模型能够得到现实可行的露天矿短期调度。 To solve feasibility problem of the short-term production scheduling of open pit mine , a new concept, ' regularity of a mining region', was introduced. A distance-based regularity measurement was proposed, but the nonlinear measurement has limited its application. To overcome the limitation, a method was put forward to convert it to a linear representation. Adding the distance-based regularity measurement as an additional objective function to a general open pit mine production scheduling model, a multi-objective programming model was formulated. The point -estimated weighted-sums method was applied to solve the proposed model. The computation results indicated that the new model could achieve a more practical open pit mine production scheduling.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2005年第2期195-199,共5页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70171030 60274049)霍英东青年教师基金资助项目(81073)
关键词 露天矿 生产调度 建模 open pit mine production scheduling modeling
  • 相关文献

参考文献10

  • 1王青,史维祥..采矿学[M],2001.
  • 2CACCETTA L, HILL S P. An application of branch and cut to open pit mine scheduling[J]. Journal of Global Optimization, 2003,27:349-365. 被引量:1
  • 3CACCETTA L, HILL S P. Branch and cut methods for network optimization[J]. Mathematical and Computer Modeling,2001,33:517-532. 被引量:1
  • 4GERSHON M. Heuristic approaches for mine planning and production scheduling[J]. Int. Journal of Mining and Geological Engineering, 1987,5:1 - 13. 被引量:1
  • 5DAGDELEN K. Optimum multi period open pit mine production scheduling[D]. Golden: Colorado School of Mines, 1985. 被引量:1
  • 6DAGDELEN K, JOHNSON T B. Optimum open pit mine production scheduling by Lagrangian parameterization [A].Proceeding of 19th APCOM Symposium[C]. University Park,PA:SME- AIME, 1986. 127-139. 被引量:1
  • 7ZHANG Y Q, YUN Q X, GUI E Y, XU L J. A new approach for production scheduling in open-pit mines[A]. Proceeding of the 19th APCOM Symposium[C]. University Park,PA:SME- AIME, 1986.71-78. 被引量:1
  • 8FYTAS K. A computerized model of open pit short and long range production scheduling[A]. In: Proceeding of 19th APCOM Symposium [C]. University Park, PA: SME - AIME,1986. 109-119. 被引量:1
  • 9STEUER R E. Multiple criteria optimization:theory, computation, and application [M]. Hoboken: John Wiley & Sons,Inc. ,1986. 被引量:1
  • 10WHITE D J. A bibliography on the applications of mathematical programming multiple-objective methods [J]. Journal of the Operational Research Society, 1990, 41(8): 669-691. 被引量:1

同被引文献31

引证文献4

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部