摘要
白银公司小铁山多金属矿为典型的高地压软岩矿山,由于地压活动频繁、巷道和采场破坏严重等原因,前期生产中滞留了大量残矿。根据调查踏勘,将小铁山矿残矿划分为三中段无底柱分段崩落法开采期间形成的残矿,四中段、五中段多种充填法试验期间形成的残矿和六中段~八中段上向巷道式进路充填法开采期间形成的残矿。针对小铁山矿不同区域残矿回采条件复杂多变的特点,以"小范围、小规模、小断面、小设备、小规格"机械化开采为指导思路,制定了五种可行的残矿方案,并根据实际情况灵活选用。
Xiaotieshan polymetallic mine is a typical high-pressure soft rock mine.Due to frequent ground pressure activities and serious damage to roadways and stopes,a large amount of residual ores are stranded in the early production.According to the investigation,the residual ore of Xiaotieshan mine can be divided into the residual ore formed during caving method in third sublevel,the residual ore formed during the test of multiple filling methods in the fourth sublevel and fifth sublevel,and the residual ore formed during the upward roadway filling mining method.In view of the complex and changeable characteristics of the residual ore mining conditions in different areas of Xiaotieshan mine,five feasible residual ore plans have been formulated with the guidance of“small scale,small scale,small section,small equipment,and small specifications”mechanized mining.And flexibly to choose the above scheme according to the actual situation.
作者
张海磊
王序威
张亭
焦满岱
孟慧媚
赵文奇
ZHANG Hailei;WANG Xuwei;ZHANG Ting;JIAO Mandai;MENG Huimei;ZHAO Wenqi(Northwest Institute of Mining and Metallurgy,Baiyin 730900,China;Gansu Provincial Engineering Laboratory of Deep Efficient Mining and Disaster Control,Baiyin 730900,China;Baiyin Nonferrous Group Co.,Ltd.,Baiyin 730900,China)
出处
《中国矿业》
北大核心
2020年第S02期292-296,共5页
China Mining Magazine
基金
甘肃省科技创新券支持项目资助(编号:2017年第5批第80号)。
关键词
残矿回采
高地压
软岩
崩落法
充填法
residual ore mining
high ground pressure
soft rock
caving mining method
filling mining method