期刊文献+

煤矿大型斜巷带式输送机带面更换工艺研究 被引量:4

Belt replacement for belt conveyor in large inclined lane of coal mine
下载PDF
导出
摘要 针对目前煤矿大型斜巷带式输送机带面更换的传统工艺存在工艺繁琐、费时、费力、安全风险非常大等问题。以色连二矿主斜井带式输送机带面更换为例,介绍借助于履带牵引连续换带装置,通过与合肥设计院、太原博世通公司合作设计完成的安全系数大、技术含量高的专用换带作业平台进行换带的新工艺。实践表明:使用新工艺,充分解决了传统工艺存在的一系列问题,使带面更换达到了安全、高效、经济的三方面要求。 At present,the traditional technology of belt replacement for large inclined lane belt conveyors in coal mines is cumbersome,time-consuming,labor-intensive,and has high safety risk.Taking the belt surface replacement of the main inclined shaft belt conveyor of Selian No.2 Mine as an example,we introduced the continuous belt change device with crawler traction operating on a new belt-changing platform with high safety factor and high technical content.Practice has shown that the new technology fully solves a series of problems in the traditional technology,so that the belt surface replacement meets the three requirements of safety,efficiency and economy.
作者 王宇挺 汪徐林 马贵忠 杨波 WANG Yu-ting;WANG Xu-lin;MA Gui-zhong;YANG Bo(Ordos Mine Construction and Installation Branch,Huaihe Energy Western Coal Power Group Co.,Ltd.,Ordos 017000,China)
出处 《煤炭工程》 北大核心 2020年第S01期84-87,共4页 Coal Engineering
关键词 煤矿 斜巷 带式输送机 带面更换 更换工艺 coal mine large inclined lane belt conveyor belt replacement replacement process
  • 相关文献

参考文献6

二级参考文献4

共引文献1

同被引文献32

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部