期刊文献+

基于三维激光扫描技术的机场捷运轨交系统地下隧道调线调坡测量技术研究 被引量:5

Technical Research on Route and Gradient Adjustment Measurement of Underground Tunnel of Airport Mass Rapid Transit System Based on 3D Laser Scanning
下载PDF
导出
摘要 上海浦东国际机场旅客捷运系统将连接新建卫星厅与既有航站楼,为国内首次将地铁A型车应用于机场交通。该工程涉及地上段地下段衔接、既有段新建段衔接、直线段曲线段衔接、盾构段明挖段衔接及下穿飞行区滑行道等多项技术难题。本文将结合这些技术难题,以自动三维激光扫描技术为基础,探究该工程轨道交通系统地下隧道调线调坡测量的技术与方法。 The mass rapid transit system of Shanghai Pudong International Airport will connect the new Satellite Hall Ⅲ with TerminalⅠ and Terminal Ⅱ,which is the first time of using model A metro train in airport traffic in China mainland. This project involves many difficulties such as the connection between ground and underground sections,between finished and constructing sections,between linear and curve sections,between shielding and digging sections,and the underground passing through airport runway. Considering these difficulties,this paper conducts research on the techniques and methods of route and gradient adjustment measurement of underground tunnel of airport mass rapid transit system based on 3 D laser scanning.
作者 吴狄 WU Di(Shanghai Surveying and Mapping Institute,Shanghai 200063,China)
机构地区 上海市测绘院
出处 《测绘与空间地理信息》 2020年第9期219-222,共4页 Geomatics & Spatial Information Technology
关键词 三维激光扫描 机场捷运系统 地下隧道 调线调坡 three-dimensional laser scanning airport mass rapid transit system underground tunnel route and gradient adjustment
  • 相关文献

参考文献3

共引文献159

同被引文献47

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部