5Chien S, Schonfeld P. Optimal work zone lengths for four-lane high- ways [ J ]. Joumal of Transportation Engineering ,2001, 127 ( 2 ) : 124-131. 被引量:1
6Jiang X M, Adeli H. Freeway work zone traffic delay and cost optimi- zation model [ J]. Journal of Transportation Engineering, 2003, 129(3) :230-241. 被引量:1
7Chen C H, Sehonfeld P. Work zone lengths for a four-lane road with an alternate route [ J ]. Joumal of Transportation Engineering, 2005,131 (10) :780-789. 被引量:1
8Chen C H, Schonfeld P. Work zone optimization for two-lane highwaymaintenance project [ J ]. Transportation Research Record, 2004 ( 1877 ) :95-105. 被引量:1
9Tang Yimin, Chien S. Optimization of work zone schedule considering time-varying traffic diversion [ C]//Proc of the 89th Transportation Research Board Annual Meeting. Washington DC: IEEE Computer Society, 2010. 被引量:1
10Ning Yang, Schonfeld P. Impact of user diversion behavior on work zone operation optimization [ C ]//Proc of the 90th Transportation Research Board Annual Meeting. Washington DC: IEEE Computer Society, 2011. 被引量:1