新型槽式预埋件对撑加固体系施工技术 被引量:1

Construction Technology of Bracing Reinforcement System by New Slot Type Embedded Parts
下载PDF
导出
摘要 在城市地下综合管廊工程建设过程中,槽式预埋件安装质量的好坏,直接关系到管廊施工的整体效果。而传统安装工艺费时费力、安装质量差,为解决以上问题,研究形成了新型槽式预埋件对撑加固杆系统,施工效益明显。通过对该体系的组成和工作原理,以及施工工艺技术进行介绍,总结的施工经验可供类似项目借鉴。 In the construction process of urban underground comprehensive pipe gallery, the installation quality of slot type embedded parts is directly related to the overall effect of pipe gallery construction. However, the traditional installation process is time-consuming and labor-intensive, and the installation quality is poor. In order to solve the above problems, a bracing reinforcement system by new slot type embedded parts has been developed, which has obvious construction benefits. Through the introduction of the composition, working principle and construction technology of the system, the construction experience summarized can be used as reference for similar projects.
作者 蔡忠康 魏忠鹏 张志猛 李博洋 CAI Zhongkang;WEI Zhongpeng;ZHANG Zhimeng;LI Boyang(China Construction Third Engineering Bureau Group Co.,Ltd.,Beijing 100097,China)
出处 《建筑施工》 2020年第7期1274-1276,共3页 Building Construction
关键词 地下综合管廊 槽式预埋件 对撑加固系统 工厂预制 空间定位 underground comprehensive pipe gallery slot type embedded parts bracing reinforcement system factory prefabrication spatial positioning
  • 相关文献

参考文献7

二级参考文献27

共引文献15

同被引文献2

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部