摘要 以成都轨道交通倪家桥站扩能改造工程为背景,介绍了侧墙改造开洞的详细工序以及相关保护措施,并采用数值模拟方法,定量分析了各破除步序下既有车站结构变形和内部应力变化情况。通过对全施工过程的模拟,揭示了侧墙破除过程中既有结构内力及沉降变化最敏感的阶段。 Taking the capacity expansion and reconstruction project of Nijiaqiao Station of Chengdu rail transit as the background,this paper introduces the detailed process and relevant protection measures of side wall reconstruction and opening,and uses the numerical simulation method to quantitatively analyze the structural deformation and internal stress change of existing station under each step of breaking.Through the simulation of the whole construction process,the most sensitive stage of the internal force and settlement of the existing structure in the process of side wall breaking are revealed.
作者 杜志涛 郭宏博 DU Zhitao;GUO Hongbo(Guangzhou Metro Design and Research Institute Co.,Ltd.,Guangzhou,Guangdong 510010,China)
出处 《施工技术》 CAS 2020年第13期109-113,共5页 Construction Technology
关键词 既有地铁车站 侧墙 改造 小导洞 变形 数值模拟 existing subway station side wall reconstruction small guide holes deformation numerical simulation
  • 相关文献

参考文献8

二级参考文献26

共引文献39

同被引文献76

引证文献11

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部