拼装式锚杆(索)框架现场试验研究 被引量:3

Field Test Study on Assembled Anchor Bolt(Cable)Frame
下载PDF
导出
摘要 现有的锚杆(索)框架都是现浇施工,其支模、浇注、养护等花费的时间较长,不利于高边坡和滑坡地质灾害的抢险与快速治理。根据锚杆(索)框架的受力特点,从减轻预制混凝土梁的重量、方便现场拼装施工的角度考虑,提出了单向变截面和双向变截面预制混凝土拼装式框架结构,并对各种拼装式框架结构进行了现场张拉加载试验。结果表明:单向变截面拼装框架结构(Ⅰ型)适用于单孔锚索拉力600~800 kN且吊机可以到达的边坡治理,双向变截面拼装框架结构(Ⅱ型)适用于单孔锚索拉力300~500 kN而需人工扛抬构件的边坡治理。 The existing anchor bolt(cable)frame is cast-in-place construction,which takes a long time to form,pour and maintain,which is not conducive to the rescue and rapid treatment of high slope and landslide geological hazards.According to the mechanical characteristics of anchor bolt(cable)frame,from the perspective of reducing the weight of the precast concrete beam and facilitating on-site assembly construction,a unidirectional variable cross-section and bidirectional variable cross-section precast concrete assembled frame structure was proposed,and on-site tensile loading tests were carried out on various assembled frame structures.The results show that the unidirectional variable cross-section assembled frame structure(TypeⅠ)is suitable for the treatment of slopes with a single-hole anchor cable tension of 600~800 kN and can be reached by the crane.The bidirectional variable cross-section assembled frame structure(TypeⅡ)is suitable for the treatment of slopes with a single-hole anchor cable tension of 300~500 kN,which requires manual lifting of components.
作者 郑静 安孟康 苏俊霞 甄作林 ZHENG Jing;AN Mengkang;SU Junxia;ZHEN Zuolin(Northwest Research Institute Co.Ltd.of C.R.E.C,Lanzhou 730000,China)
出处 《铁道建筑》 北大核心 2020年第7期93-97,共5页 Railway Engineering
基金 科技部科研院所技术开发研究专项资金(2009EG123201)。
关键词 铁路路基 锚杆(索)框架 现场试验 预制拼装 边坡治理 railway subgrade anchor bolt(cable)frame field test prefabricated assembly slope treatment
  • 相关文献

参考文献9

二级参考文献63

共引文献175

同被引文献16

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部