摘要
北京地铁16号线区间下穿既有9号线结构,采取多项措施进行综合控制,通过对既有线实时动态监测,严格各道施工工序衔接,加强过程措施实施,在非降水条件下顺利地完成了长距离穿越,确保了既有结构变形在允许变形控制值范围内。
Beijing subway line 16 interval passes through under the structure of line 9,and many measures were adopted for general control,such as real-time dynamic monitoring on existing subway line,strict management of connection among different construction steps and effective implementation of process measures,etc.,to successfully realize long-distance passing through without dewatering and to keep the deformation of existing structure within the allowable scope.
作者
张开坤
ZHANG Kai-kun(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处
《建筑技术》
2020年第7期802-805,共4页
Architecture Technology
关键词
富水砂卵石
下穿既有线
注浆止水
water-rich sand gravel stratum
passing through under existing subway line
grouting water-stop